8. Conflict rules

ID IF (condition) THEN (action) BECAUSE (reason) Example (software/infra) Basis
K1 a rule that adds parts (P44, P45, P46, P40, P41, P47) conflicts with P23 (fewer parts) add those parts only as far as the master rule and the rigor matrix require both adding and removing parts change failure risk multi-AZ for production, single-AZ for development sourced (see P23, P44, P45)
K2 a fix is needed faster than P64 (change review) and P65 (small steps) allow, because of P73 (time until harm) use a predefined emergency change path with a shorter review, and do the full review afterwards skipping review without a plan removes every check at the moment of highest stress a hotfix path with one approver and a mandatory postmortem within 48 h author's synthesis; no single source
K3 P27 (tolerate variation) seems to conflict with P33 (reject bad input) tolerate variation within the specification (P27); reject and report input outside the specification (P33) both rules aim at stable behavior; they differ only in where the boundary lies accept any valid timestamp format the schema allows; reject a timestamp field that is missing author's synthesis from Taguchi and RFC 9413
K4 preserving evidence (P83) would delay recovery beyond the time until harm (P73) capture evidence automatically and fast; if harm is imminent, restore service first and keep whatever the automation captured both the evidence and the service matter, and automation makes the trade-off small crash dumps and log shipping run before every automatic restart author's synthesis; no single source
K5 P18 (decide reversible decisions fast) conflicts with P64 (change review) and P56 (independent checker) scale the review depth with reversibility and consequence: reversible and low consequence → peer review or self-check; irreversible or high consequence → full review, P42 and an external checker both slowness and unreviewed irreversible harm are failures a new dashboard: the team decides; deleting historical audit logs: two approvers and a legal review author's synthesis from the Amazon 2015 letter and the master rule
K6 P7 (leave the method to the people doing the work) conflicts with P71 (checklists), P72 (critical control points) and P61 (qualified procedure) prescribe the method only at critical control points, in qualified or regulated procedures, and where the rigor matrix requires it; everywhere else give intent and constraints prescribed methods everywhere stop initiative; free methods at critical points remove proven protections "use the restore checklist" (prescribed); "improve developer onboarding" (intent only) author's synthesis from ADP 6-0 and P61
K7 P5 (psychological safety) and P80 (blameless analysis) seem to conflict with accountability (P2, P6, P43, legal duties) treat honest errors and system weaknesses without blame; treat deliberate violations, reckless behavior and fraud through a defined, fair disciplinary procedure blame for honest errors hides information; no consequence for deliberate violations destroys trust and controls a wrong command during an incident → blameless postmortem; bypassing the two-person rule on purpose → disciplinary procedure author's synthesis; no single source
K8 P21 (specific, challenging goals) conflicts with P19 (indicators are gamed) and with Deming's rejection of numerical goals use goals for direction and learning; do not tie pay or ranking mechanically to one indicator; pair every target with a counter-indicator goals raise performance, but a single rewarded number distorts the work the team goal "halve build time" has a guard "test coverage does not drop"; bonuses are not calculated from the build time author's synthesis from Locke & Latham, Campbell and Deming